Back to piassa.ai

Boston Built Week · Held Thursday, November 19, 2026

Agentic building automation starts with a record you can trust.

AI for buildings can only be as good as the record behind it, and most building records are wrong. Spend an hour with Piassa at Harvard Innovation Labs. See how owners, builders and operators get to a record they can rely on, and what agents can do once they have one.

This event has taken place. Thank you to everyone who joined us at Harvard Innovation Labs.

The hour

Three parts, in this order.

01

Founder talk

Mubarek Hassen on what it takes to digitize a building, automate its operations and put agents to work on it.

02

Live walkthrough

How Piassa turns closeout documents and field data into a building record that owners and agents can rely on.

03

Open tables

Owners, builders and operators compare the record problems they run into, and what has worked.

The problem

The record drifts away from the building

Every AI tool on a building works from its records. The record starts to drift during construction, arrives at turnover as binders and PDFs, then keeps drifting for decades as equipment changes. An agent that reads the wrong warranty date or equipment tag will act on it.

Record accuracy. The share of installed equipment the record describes correctly: make, model, location, warranty and service history. The lines are illustrative. The grey band is survey data.
  • A typical building record (illustrative)
  • What an agent needs to act safely
  • The gap
  • Registers today, about 60 to 70% accurate on average (SFG20 survey)

Illustrative chart, from design to year 20, on a scale from 40 to 100 percent. A typical record starts near 80 percent, falls to about 60 percent during construction, is brought back to about 84 percent at turnover, then falls step by step to about 54 percent by year 20. The level an agent needs stays near the top of the scale. The space between the two lines is the gap. A band from 60 to 70 percent marks the average accuracy that facilities teams report today.

  1. RFIs and substitutions

    What gets installed is not what was drawn.

  2. Change orders

    The scope changes on site. The drawings catch up later, or never.

  3. Turnover

    The record is brought up to date, then handed over as binders and PDFs.

  4. Parts swapped, not logged

    A motor or a valve is replaced. The record still shows the old one.

  5. Tenant improvements

    Floors are rebuilt. The base building record is not updated.

  6. Systems replaced

    Whole systems change. The record describes equipment that is gone.

15%

of facilities professionals say their asset register, the list of equipment in their buildings, is 100% accurate. On average, registers are about 70% accurate where teams use software and about 60% where they use spreadsheets or paper.

Source: SFG20, State of Facilities Management 2026. UK survey of nearly 200 professionals.
$9.1B

of the $15.8B a year that poor data exchange costs large US commercial, institutional and industrial buildings falls in operations and maintenance.

Source: NIST GCR 04-867, Table ES-2. 2002 dollars.

Who should come

Anyone who owns, builds, hands over or runs a building.

  • Owners and facilities teams
  • Owner's representatives and commissioning agents
  • General contractors and builders
  • Acquirers and asset managers

Bring one record problem from a building you own, build or run. The best conversations at the tables start there.

Your hosts

Piassa builds agentic automation for buildings, starting with a building record that owners and agents can trust. Agents that act on the building management and maintenance systems, within limits the operator sets, come next. Piassa is part of the High Potential Venture Program at Harvard Innovation Labs.

Mubarek Hassen

Founder and CEO, Piassa

Ten years building and operating data centers, offices, labs and hospitals at DPR, CBRE and Lincoln Property. MBA from Harvard Business School.

Amanuel Shumuye

Piassa

Finishing an MS in real estate development at MIT, after construction and development roles at Holder Construction, Brasfield & Gorrie and Brookfield Residential.

Getting there

Batten Hall, Harvard Innovation Labs
125 Western Avenue, Allston, MA 02134

Open in Google Maps

When you arrive, give your name at the Batten Hall security desk.

  • MBTA buses 66, 70 and 86, or the Harvard shuttle from Harvard Square.
  • Metered parking in the Life Lab lot, $2 an hour.
  • A Bluebikes station outside the building.

Thank you for joining us

This event took place on Thursday, November 19, 2026, at Harvard Innovation Labs in Allston. Questions? Write to team@piassa.ai.

Back to piassa.ai