Piassa reads the closeout package where it already lives, checks every deliverable against the owner's closeout standard, and returns one record: what was delivered, what is missing, who owes it, and the asset and warranty register for operations.
One project, one package, one brief in five business days. Twenty per quarter. No cost, no commitment.
Four steps from a closeout package to a working record. A named reviewer checks every finding before it reaches you.
Read-only access to the folder where the package already lives. Each subcontractor gets a scoped upload link for what they owe.
Every file is tagged against the closeout standard, matched to the asset it covers, and checked for completeness, not just presence.
One list of what is still owed, by party, tied to retention release and occupancy, with the deficiency letter drafted.
The asset and warranty register and an indexed record go to the operations team and export to the CMMS.
The package arrives late, incomplete, and in the wrong format, and nobody reads it end to end before sign-off.
of owners receive digital handover documents that meet their requirements.
Dodge Construction Network, The Data-Centric Owner, 2025a year spent by project teams looking for information.
Procore and Dodge survey, 2026a year lost to inadequate information handover in US capital facilities, two thirds of it during operations.
National Institute of Standards and TechnologyOne record, four parties. Each sees the items they are responsible for and what is still outstanding.
Every closeout requirement checked against your standard before retention is released. Occupancy blockers and who owes them, in one brief.
Closeout tracked across every project in the pipeline, with a verified asset and warranty record ready for the lender, the buyer, or the property team.
Weeks of project engineer time on the closeout binder cut to a review. One list of what is owed, by subcontractor, with scoped upload links instead of email chasing.
A working asset register on day one, with O&M manuals and as-builts linked to each asset and the register exported to the CMMS.
Send the package and see the gap list before you decide anything. Or book fifteen minutes and we will walk through one of your own buildings.
Request the free gap check Book fifteen minutes